Previous | Contents | Index |
Table 2-2 lists disk space needed for Enterprise Integration Packages components during and after installation. It also lists the approximate installation times, based on CD installations. This does not include the time needed for pre- and postinstallation configuration tasks, or for running the Installation Verification Procedures (IVPs).
Component | Blocks During Installation | Blocks After Installation | Time (Minutes) | |
---|---|---|---|---|
HP Advanced Server for OpenVMS | 139 500 | 139 500 | 10 | |
HP Archive Backup System for OpenVMS Management Tools | 50 000 | 50 000 | ||
HP DECnet-Plus for OpenVMS Alpha (End System) | 89 000 | 89 000 | 4 | |
Base Kit | 82 000 | 82 800 | 5 | |
OSAK | 5 000 | 6 900 | 5 | |
FTAM | 28 000 | 28 000 | 5 | |
VT | 4 000 | 3 500 | 5 | |
HP DECprint Supervisor (DCPS) for OpenVMS Alpha (Open and Plus) | 7 400 | 6 900 | 5 | |
HP DECwindows Motif for OpenVMS Alpha 1 | 317 000 1 | 210 000 1 | 20 | |
Compaq Office Server for OpenVMS | 277 500 | 277 500 | 90 | |
HP PATHWORKS for OpenVMS (Advanced Server) | 226 000 | 126 732 | 10 2 | |
HP TCP/IP Services for OpenVMS | 125 000 | 125 000 | 5 |
Previous | Next | Contents | Index |