I'm going to be doing the oracle9i patches for a 5.1 cluster this weekend
and I will be doing a rolling upgrade. Included in the patch kit it looks
like there are two separate dupatch installs that I will need to do. One for
T64V5117-C0038308-11129-ER-20010627.tar and one for
TCV5117-C0009702-11280-ER-20010723.tar. Can I do a dupatch on one patch and
then switch directories into the second directory and do dupatch again or do
I have to complete the whole rolling upgrade on one patch and do the
complete rolling upgrade on the second patch kit?
Has anyone done the Oracle9i patches before that can give me some insight?
Thanks
Howard
Received on Fri Oct 19 2001 - 02:28:11 NZDT