NSR schedule problem

From: <tsh_at_mrc-lmb.cam.ac.uk>
Date: Sat, 06 May 2000 13:34:56 +0100 (BST)

Hi all,
Because my system crashed mid way through a full backup, I want to
modify the schedule to do the full backup the next day.
My schedule is the 'Full on 1st Friday of the month' and I want to
apply an override to do Full on Saturday, but get the message

Modify Failed: 'NSR schedule 'Full on 1st Friday of month' may not be modifed.'

I've certainly done this before, but rarely and I cant remember when.
I'm running NetWorker 5.5.1. Any ideas anyone?

Thanks,



Terry Horsnell (tsh_at_mrc-lmb.cam.ac.uk)